Sunrise Water Authority
Conditions Assessments
Aging infrastructure poses a challenge to maintaining the reliability of the system and the safety of the water delivered to customers. Elcon is conducting a system-wide evaluation of key electrical assets of the pump stations and wells (distribution power, standby power, lighting, instrumentation, and controls equipment) through a series of conditions assessments. This will include reviewing existing information, generating asset inventories, performing and documenting condition assessments, and providing a risk assessment and recommended action plan based on the results of the findings.
Owner: Sunrise Water Authority
Location: Happy Valley, OR
Project Features:
- System-wide evaluation of electrical assets